Case Study

Hartington Mains Renewal Scheme

  • Hartington Mains Renewal Scheme

  • June 2023 – March 2024

  • £2.4m

Installation of approximately 10,200 metres of new distribution mains and associated fittings to include the construction, commissioning, handover and reinstatement of 250, 200, 180, 125, 90, and 63mm OD polyethylene and barrier pipe in Lozell’s, Birmingham. New valves, washouts and hydrants are also required as indicated on the relevant drawings.

Gallery