Case Study

Forli Strada

  • 355 water main installation on the Forli Strada Project

  • 2022

  • Clancy Docwra

  • circa £300,000

In 2022 we worked with the Forli Strada project to assist with the installation of the water mains as well as the bypass installation.

Gallery