Case Study
Hartington Mains Renewal Scheme
Installation of approximately 10,200 metres of new distribution mains and associated fittings to include the construction, commissioning, handover and reinstatement of 250, 200, 180, 125, 90, and 63mm OD polyethylene and barrier pipe in Lozell’s, Birmingham. New valves, washouts and hydrants are also required as indicated on the relevant drawings.